California Independent System Operator
The California Independent System Operator (CAISO) is a nonprofit public benefit corporation that manages the high-voltage electricity grid for 80 percent of California and a portion of Nevada [1], . Regulated by the Federal Energy Regulatory Commission (FERC), CAISO ensures the reliability of approximately 26,000 miles of transmission lines and operates a competitive wholesale energy market [4], . The entity acts like a traffic controller for the grid, matching electricity buyers and sellers through over 28,000 daily transactions without owning any generation or transmission assets itself [4], . CAISO is governed by a five-member Board of Governors appointed by the Governor of California and confirmed by the State Senate [11], . Its headquarters are located in Folsom, California, and it serves more than 30 million residents [5], .
Historical Background
The California Legislature created CAISO in 1996 through Assembly Bill 1890 to restructure and deregulate the state's electricity industry [2], . It officially began operations in March 1998, separating the transmission system operator from the power exchange to foster competition [2], . Following the 2000–2001 California energy crisis, the state's power exchange went bankrupt, and CAISO eventually implemented a nodal market in 2009 to improve price transparency [2], . In 2014, CAISO launched the Western Energy Imbalance Market (WEIM) to allow real-time energy trading across 11 Western states [11]. The entity has faced past penalties, including a $6 million settlement for standards violations related to the 2011 Southwest blackout [3]. Recent expansions include the 2015 Senate Bill 350, which encouraged the transformation of CAISO into a broader regional organization [8].
Current Events
As of March 2026, CAISO is advancing its 2026–2027 Transmission Planning Process, with the Interregional Transmission Project submission window closing on March 31, 2026 [10], . In February 2026, CAISO reported a strategic shift toward reliability-driven transmission projects, earmarking $1.3 billion less for development than the previous year to focus on grid stability [9]. A major milestone for 2026 is the scheduled launch of the Extended Day-Ahead Market (EDAM), which aims to optimize grid use across the West with participation from PacifiCorp and Portland General Electric [9], . On February 12, 2026, the organization held a stakeholder call to discuss a new finance initiative involving a revenue requirement cap increase and startup funding for the Regional Organization for Western Energy (ROWE) [18], . The Board of Governors is expected to review the final 2026–2027 Transmission Plan in May 2026 [6], .
California Independent System Operator is a state agency serving CA. MeetingBriefs.ai publishes AI-generated summaries of its public meetings, along with an entity overview, member roster, meeting videos, and links to official agendas.
No meeting summaries yet
Summaries appear here as meetings are processed
Entity Details
- Jurisdiction Type
- STATE
- State
- CA
- Website
- caiso.com
- Members
Severin Borenstein ISO Board Chair Joe Eto ISO Board Vice Chair Angelina Galiteva ISO Board Member Mary Leslie ISO Board Member Jan Schori ISO Board Member Rebecca Wagner WEM Chair Andrew Campbell WEM Vice Chair Deborah Smith WEM Member Rob Kondziolka WEM Member Anita Decker WEM Member - Registry ID
- f53cfbb3-f50b-4216-aff1-2bc4c4e1a455
No videos for this period
Try a different time range or check back later